Strategies tab
Strategy
Strategy 1
Here, each bevel is split into individual machining operations. The individual machining operations are generated from bottom (bottom bevel) to top (top bevel).
Strategy 2
The following changes are possible here: Upper bevel in I-cut, upper bevel in lower bevel and lower bevel in I-cut. A vertical cut cannot change to a bevel cut.
Strategy 3
Here, all changes between the individual machining operations are possible.
Strategy 4
Here, all the original identical bevels can be cut together. All changes with an original vertical cut are possible.
Strategy 5
This is a machine-specific strategy for Pedilas.
Repiercing for each part bevel
Here, a new piercing is made for each part bevel.