Order + material data tab
Order
Comment 1 to 20
Comments can be entered here.
Material
The information here is only necessary if a specific sheet or material is intended for the order.
Article
The article number of the sheet is entered here.
Charge
The batch designation of the sheet is entered here.
Designation
The designation of the sheet is entered here.
Storage location
The storage location of the sheet is entered here.
Material selection
Use the .. button to select a sheet from the material pool. The data for "article", "batch", "designation" and "storage location" are then taken from the material pool.
Run times
Target (min)
The calculated production time for the individual part in minutes is displayed here.
Sheet target
Here, the calculated production time in minutes for all nested parts of the order is displayed.
Machine current
If the machine reports this, the actual production time in minutes for all parts of the order is displayed here.
Surfaces
Target (sqm)
Here, the calculated area of the individual part is displayed in square metres.
Sheet target
Here, the calculated area for all parts of the order is displayed in square metres.
Machine current
If the machine reports this, the actual area of all parts of the order is shown here in square metres.
Disposal
Number of the storage table
The table on which the part is placed during palletising is entered here.
Stack number
The stack on which the part is placed during palletising is entered here.